Security Checklist for sour gas fitting

Before the pressure from the hydrostatic test operation to prevent accidents, we need to make good preparation during pressure processing and disappointing operations. This sour gas fitting is made as standard operating procedures. And here is the security checklist for each phase. Equipment and Pipe Line Specification Sheet, which refers to pressure and temperature design is available and full.

The sour gas fitting testing in relevant documents and the temperature standard is already clearly defined. Supported documents such as P & ID and Isometric drone are available and are tailored to the features made in the field. Distribution of pressure test plans in all the relevant departments at the plant site at least two days before the date of execution.